Construction Glossary

Construction Terms, Explained: BIM, QA/QC, Safety & Project Terms

Short, plain definitions of the terms site, BIM, quality, safety and project controls teams use every day, with a link to where SitePace.ai helps with each one.

Site Capture and Documentation

360° Site Documentation

A dated visual record of a construction site made by walking it with a 360° camera. Each capture is placed on the floor plan, so anyone can reopen the exact location on any date.

360° Capture →

Reality Capture

Recording real site conditions digitally, using 360° cameras, laser scanners or drones, so the built state can be reviewed, measured or compared with design without visiting the site.

360° Capture →

Construction Progress Monitoring

Tracking what has actually been built against the plan and schedule, ideally from dated site evidence rather than reported percentages.

360° Capture →

As-Built Drawings

Drawings or models that show a building as it was actually constructed, including changes from the design. They are used for handover, maintenance and future alterations.

BIM Services →

Digital Twin

A digital representation of a building or site that is kept in step with its real condition, for example a model linked to dated site captures and project data.

360° Capture →

Orthomosaic

A single, geometrically corrected map image stitched from many overlapping drone photos, so distances and areas can be read from it like a map.

Drone Intelligence →

Construction Timelapse Camera

A fixed camera that photographs a site at set intervals to show progress over weeks or months; AI can also review the footage for activity and safety.

CCTV AI Monitoring →

BIM and Design

Building Information Modeling (BIM)

Creating and managing a 3D model of a building in which every element carries information such as type, size, material and location, shared by design, construction and facility teams.

BIM Services →

Level of Development (LOD)

How complete and reliable a model element is, from LOD 100 (conceptual) upwards; higher levels carry more exact geometry and information. SitePace BIM services deliver models from LOD 100 to 500.

BIM Services →

2D to BIM

Turning 2D drawings into a 3D BIM model, discipline by discipline (architecture, structure and MEPF services), so teams work from one coordinated model.

2D to BIM →

Scan to BIM

Modeling an existing building or site into BIM from a laser scan point cloud. It is used for renovation, retrofit, as-built records and checking built work against design.

Scan to BIM →

Point Cloud

Millions of measured 3D points recorded by a laser scanner or photogrammetry that together describe the surfaces of a building or site.

Scan to BIM →

IFC (Industry Foundation Classes)

An open, vendor-neutral file format for BIM models, so models can be exchanged between different software tools.

BIM Services →

Clash Detection

Checking combined discipline models for places where elements conflict, such as a duct running through a beam, so the conflict is resolved before construction.

BIM Services →

MEPF

Mechanical, electrical, plumbing and fire protection: the building services disciplines that are usually modeled and coordinated together.

BIM Services →

RFI (Request for Information)

A formal question from the site or a contractor to the designer to clarify drawings, specifications or a site condition.

BIM Services →

Quality

QA/QC

Quality assurance (the processes that prevent defects) and quality control (the inspections and tests that find them) on a construction project.

AI Quality Control →

Snagging

Inspecting finished or nearly finished work to list defects (snags) that must be fixed before handover. A snag list records each item, its location, owner and status.

AI Quality Control →

Punch List

The US term for a snag list: the outstanding defects and incomplete items the contractor must close before the owner accepts the work.

AI Quality Control →

NCR (Nonconformance Report)

A formal record that work does not meet the specification or drawings, with the required corrective action and its closeout.

AI Quality Control →

ITP (Inspection and Test Plan)

A plan listing the inspections and tests for each work activity, including hold points where work cannot continue until it is checked.

AI Quality Control →

Defects Liability Period

A period after completion during which the contractor must repair defects that appear. Dated site records help show when and where a defect started.

AI Quality Control →

Safety

EHS (Environment, Health and Safety)

The policies, inspections and records that protect people and the environment on a construction site.

AI Safety & EHS →

PPE (Personal Protective Equipment)

Equipment such as helmets, high-visibility vests, safety shoes, gloves and harnesses that protects workers from site hazards.

AI Safety & EHS →

Site Safety Inspection

A walk of the site to find hazards such as missing PPE, unguarded edges, unsafe scaffolding or poor housekeeping, and to assign corrective actions.

AI Safety & EHS →

Corrective Action

The fix assigned for a quality or safety issue, with an owner and due date, closed only when a later check shows it was done.

AI Safety & EHS →

Project Controls and Management

PMC (Project Management Consultant)

A firm that manages a construction project on the owner's behalf: schedule, cost, contractors, quality and risk. A virtual PMC does much of this remotely from site data.

Virtual Project Management →

Owner's Representative

A person or firm that represents the project owner, protecting their interests on schedule, budget and quality. The common US term for an owner-side PMC role.

Virtual Project Management →

Critical Path Method (CPM)

A scheduling method that finds the longest chain of dependent activities; any delay on that chain delays project completion.

Virtual Project Management →

Look-Ahead Schedule

A short-range schedule, usually two to six weeks, that breaks upcoming work into detail so constraints are cleared before the work starts.

Virtual Project Management →

S-Curve

A graph of cumulative planned progress or cost against time. Comparing the actual curve with the planned one shows whether a project is ahead or behind.

Virtual Project Management →

Earned Value Management (EVM)

Measuring project performance by comparing planned value, earned value and actual cost; it gives indicators such as the schedule performance index (SPI) and cost performance index (CPI).

Virtual Project Management →

WBS (Work Breakdown Structure)

A breakdown of the whole project scope into smaller deliverables and work packages, used to plan, schedule and track progress.

Virtual Project Management →

RA Bill (Running Account Bill)

An interim contractor bill for work done to date, common in India. It is checked against measured quantities and site evidence before payment is certified.

Virtual Project Management →

See These Terms on a Real Project

Walk through 360° capture, BIM checks, snagging, safety and project controls in the SitePace app with our team.

SitePace.ai

“If the whole construction project can be shown digitally and made available at your fingertips, the possibilities are immense.”

Products

© 2026 Walktheprop Pvt. Ltd. All rights reserved.

Privacy Policy

|

Terms & Conditions

|

Cookie Policy

|

Trust & Security

|

scroll down